Why does a distant motor sag badly at start, and how large must the cable be? This page walks the four-step cross-section method with a worked 380 V long-distance motor example.
Drop limits by rule: 5 percent for motor circuits in normal running with terminal voltage not below 85 to 90 percent of rated during starting, and 5 percent for lighting. Three-phase drop follows ΔU% = √3·I·L·(R·cosφ + X·sinφ)/U × 100. A handy form for 380 V copper at cosφ 0.8 is ΔU% ≈ 0.32 × I × L/(100 × S), with aluminium about 1.7 times worse.
Four steps: first pick a section by ampacity with installation and temperature correction, for example 30 A in conduit needs 10 mm² copper once the 0.8 grouping factor applies; second verify the running drop; third check thermal short-circuit withstand against the protective clearing time; fourth confirm mechanical minimums of 1.5 mm² copper and economic current density. Take the largest result of the four.
Worked example: a 55 kW, 103 A motor 300 m away with 5 percent allowed. A 70 mm² copper core carries the load and gives about 1.4 percent running drop, but starting at six times current yields 8.5 percent, terminal voltage 91.5 percent, barely inside until you add the 3 percent already lost upstream, which forces 95 and then 120 mm² or a larger transformer. Starting drop dominates on long runs, which surprises people who only checked ampacity.
| Check | Limit | Basis | If not met |
|---|---|---|---|
| Ampacity | Load times factors | Installation, temperature | Upsize |
| Running drop | 5 percent max | Line impedance | Upsize or raise voltage |
| Starting drop | Terminal above 85~90% | Starting current | Upsize or soft start |
| Short-circuit heat | Withstand to clearing | Protection time | Bigger cable, faster trip |
| Mechanical | 1.5 mm² copper min | Code minimum | Apply minimum |
| Economics | Economic density | Utilisation hours | Compare overall |
After calculating a long run, always stack the starting drop onto the upstream transformer and feeder losses, and catch the actual inrush with a recorder at the motor: a gap against calculation usually means a hidden high-resistance joint waiting for the next outage.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: See GB 50054 for LV distribution design and the GB/T 16895 series for cable ampacities. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.