Knowledge Base › Electrical Knowledge Base › Selecting thermal overload relays for heavy-duty motor starting
HomeModels
Table of contents

On this page

Electrical & Electronic Basics (698 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Selecting thermal overload relays for heavy-duty motor starting

Fans, crushers and compressors take 15 to 30 seconds to spin up, tripping a Class 10 relay at every start. Here is how to match trip class, starting method and measured starting time.

1. How it works

Trip classes are defined by time to trip at 7.2 times the setting: Class 10 operates within about 10 seconds, Class 20 within 20, Class 30 within 30. A direct-on-line centrifugal fan draws 6 to 7 times rated current for 15 to 25 seconds, so fit Class 20 or 30, or switch to an electronic relay with an adjustable class and phase-loss protection.

2. Practice and pitfalls

Measure the real starting time with a peak-hold clamp meter, add 5 seconds of margin, and pick the class above that line. Star-delta starting cuts inrush to 2 to 2.5 times rated and lets a Class 10 survive, but with only a third of the torque it will not start constant-torque loads. With a VFD, rely on the drive electronic protection instead of a bimetal on the output side.

3. Starting method vs relay class table

Starting methodInrush multipleSuggested classNotes
Direct on line6~7xClass 20/30Class 10 only if unloaded in 10s
Star-delta2~2.5xClass 10Careful with constant torque
Autotransformer3~4xClass 20Watch transition surge
Soft starter2~4x adjustableClass 10Normal after bypass
VFD driven1~1.5xDrive electronic protectionSkip the output bimetal
Heavy fans, crushers6~7x longClass 30 or electronicMeasure starting time first

4. Notes

Never copy a table without measuring: log one real start with a peak-hold clamp meter, add 5 seconds, and choose the class above that. If nothing fits, an electronic relay covers overload, phase loss and stall in one unit.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Motor starting and protection per GB/T 755; overload relays per GB/T 14048.4; machine safety per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Raising the setting to ride through start:real overload later goes undetected, insulation ages out
② Class 10 on a 25s heavy start:trips every start, bimetal drifts from repeated heating
③ Bimetal on a VFD output:chopped waveform falsifies the sensing, nuisance trips

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.